[NT 42591] Language:
Francais
English
繁體中文
[NT 5638] Help
回圖書館
[NT 5480] Login
[NT 5635] Back
[NT 59884] Switch To:
[NT 5556] Labeled
|
[NT 5559] MARC Mode
|
[NT 33762] ISBD
The ultimate improvement cycle : maximizing profits through the integration of lean, six sigma, and the theory of constraints
[NT 42944] Record Type:
[NT 1579] Language materials, printed : [NT 40817] monographic
[NT 47348] Title Information:
maximizing profits through the integration of lean, six sigma, and the theory of constraints
[NT 47261] Author:
SproullRobert.,
[NT 47351] Place of Publication:
Boca Raton
[NT 47263] Published:
CRC Press;
[NT 47352] Year of Publication:
c2009.
[NT 47264] Description:
xxxviii, 250 p.ill. : 24 cm.;
[NT 47266] Subject:
Business logistics. -
[NT 47266] Subject:
Production management. -
[NT 47266] Subject:
Six sigma (Quality control standard) -
[NT 47266] Subject:
Theory of constraints (Management) -
[NT 47265] Notes:
"A Productivity Press book."
[NT 50961] ISBN:
9781420090345
[NT 60779] Content Note:
The lean, six sigma, and theory of constraints (TOC) : improvement cycles -- Introducing the ultimate improvement cycle (UIC) -- The value stream, a scheduling system, and performance metrics -- Finding waste in the constraint -- Reducing variation and defects -- Exploiting the current constraint -- Reducing waste and variation in the current constraint -- Subordinating nonconstraints to the current constraint -- Line balancing and flow optimization -- Optimizing the constraint buffer and pulling in the nonconstraints -- Elevating the constraint and implementing protective controls -- Breaking the current constraint -- Sustaining the gains with protective controls -- System constraints and problems -- Establishing the environment for change.
The ultimate improvement cycle : maximizing profits through the integration of lean, six sigma, and the theory of constraints
Sproull, Robert.
The ultimate improvement cycle
: maximizing profits through the integration of lean, six sigma, and the theory of constraints / Bob Sproull. - Boca Raton : CRC Press, c2009.. - xxxviii, 250 p. ; ill. ; 24 cm..
The lean, six sigma, and theory of constraints (TOC) : improvement cycles -- Introducing the ultimate improvement cycle (UIC) -- The value stream, a scheduling system, and performance metrics -- Finding waste in the constraint -- Reducing variation and defects -- Exploiting the current constraint -- Reducing waste and variation in the current constraint -- Subordinating nonconstraints to the current constraint -- Line balancing and flow optimization -- Optimizing the constraint buffer and pulling in the nonconstraints -- Elevating the constraint and implementing protective controls -- Breaking the current constraint -- Sustaining the gains with protective controls -- System constraints and problems -- Establishing the environment for change..
"A Productivity Press book.".
Includes bibliographical references (p. 233-235) and index..
ISBN 9781420090345
Business logistics.Production management.Six sigma (Quality control standard)Theory of constraints (Management)
The ultimate improvement cycle : maximizing profits through the integration of lean, six sigma, and the theory of constraints
LDR
:01499cam 2200229 i 4500
001
206072
005
20120619023358.0
009
a(OCoLC)ocn229022677
009
15596063
010
1
$a
9781420090345
$b
hbk.
$d
NT2210
020
$a
US
$b
2009002289
100
$a
20100421d2009 m y0engy08 b
101
$a
eng
102
$a
us
105
$a
a a 001yy
200
1
$a
The ultimate improvement cycle
$e
maximizing profits through the integration of lean, six sigma, and the theory of constraints
$f
Bob Sproull.
210
$a
Boca Raton
$d
c2009.
$c
CRC Press
215
1
$a
xxxviii, 250 p.
$c
ill.
$d
24 cm.
300
$a
"A Productivity Press book."
320
$a
Includes bibliographical references (p. 233-235) and index.
327
0
$a
The lean, six sigma, and theory of constraints (TOC) : improvement cycles -- Introducing the ultimate improvement cycle (UIC) -- The value stream, a scheduling system, and performance metrics -- Finding waste in the constraint -- Reducing variation and defects -- Exploiting the current constraint -- Reducing waste and variation in the current constraint -- Subordinating nonconstraints to the current constraint -- Line balancing and flow optimization -- Optimizing the constraint buffer and pulling in the nonconstraints -- Elevating the constraint and implementing protective controls -- Breaking the current constraint -- Sustaining the gains with protective controls -- System constraints and problems -- Establishing the environment for change.
606
$2
lc
$a
Business logistics.
$3
205888
606
$2
lc
$a
Production management.
$3
202426
606
$2
lc
$a
Six sigma (Quality control standard)
$3
206185
606
$2
lc
$a
Theory of constraints (Management)
$3
206186
676
$a
658.4/013
$v
22
680
$a
HD38.5
$b
.S63 2009
700
1
$a
Sproull
$b
Robert.
$3
206184
[NT 59758] based on 0 [NT 59757] review(s)
[NT 60002] ALL
4樓西文圖書區
[NT 42818] Items
1 [NT 46296] records • [NT 5501] Pages 1 •
1
[NT 5501718] Search Note
[NT 5000115] Inventory Number
[NT 7898] Location Name
[NT 7947] Item Class
[NT 33989] Material type
[NT 43385] Call number
[NT 5501238] Usage Class
[NT 45600] Loan Status
[NT 48088] No. of reservations
[NT 52971] Opac note
[NT 46641] Attachments
[NT 5502] Print
E0002941
4樓西文圖書區
一般圖書
一般圖書
658.4013 S771
一般使用(Normal)
[NT 41737] On shelf
0
1 [NT 46296] records • [NT 5501] Pages 1 •
1
[NT 59725] Reviews
[NT 59886] Add a review
[NT 59885] and share your thoughts with other readers
Export
[NT 5501410] pickup library
[NT 42721] Processing
...
[NT 48336] Change password
[NT 5480] Login